Completed Projects

All

SEEV Factory – Modification Work

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: SEEV Factory – Modification Work Location: Hanoi Owner: Sei Electronic Components (Vietnam), Ltd Construction Terms: Sep-2017 Main Contractor: Zenitaka Corporation Classification of Works: M & E Works Project Outline: Factory-Plant As an elite Japanese factory M&E contractor, Kurihara Vietnam deployed state-of-the-art industrial engineering workflows to construct a resilient infrastructure for this manufacturing plant. The […]

Paramount Bed Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Paramount Bed Vietnam Factory Location: Dong Nai Owner: Paramount Bed Vietnam Co., Ltd Construction Terms: May-2014 Main Contractor: Nishimatsu Contruction Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant As an elite Japanese factory M&E contractor, Kurihara Vietnam was entrusted to deploy its state-of-the-art industrial engineering workflows for the construction of […]

VGI-1F Cold End Conversion Project

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: VGI-1F Cold End Conversion Location: Ba Ria – Vung Tau Owner: NSG Vietnam Glass Industries Ltd Construction Terms: Sep-2018 Main Contractor: NSG Vietnam Glass Industries Ltd Classification of Works: M & E Works Project Outline: Factory-Plant Industrial conversion and plant modification works demand precision engineering, zero-disruption planning, and strict compliance with hazardous environment protocols. […]

T2 – Noi Bai Extension

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: T2 – Noi Bai Extension Location: Hanoi Owner: Vietnam Airlines Construction Terms: Dec-2014 Main Contractor: Arinc Incorporated Classification of Works: M & E Works Project Outline: Factory-Plant Aviation infrastructure developments leave absolutely zero margin for technical errors. Kurihara Vietnam deployed its elite engineering frameworks to execute the specialized factory M&E contractor project packages for […]

NTPM Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: NTPM Vietnam Factory Location: Binh Duong Owner: NTPM Vietnam Co., Ltd Construction Terms: May-2014 Main Contractor: Tan Viet Tin Construction Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant Operating as a leading Japanese factory M&E contractor, Kurihara Vietnam successfully engineered and executed the full-scale mechanical and electrical infrastructure for the […]

Air Water Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Air Water Vietnam Location: Vung Tau Owner: Sanpo Electrical & Mechanical Engineering Corporation Construction Terms: Feb-2014 Main Contractor: Seamec Vietnam Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant Industrial gas production facilities operate under extreme pressure, cryogenic temperatures, and hazardous atmosphere classifications, leaving absolute zero margin for technical installation errors. […]

DIC Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: DIC Vietnam Factory Location: Binh Duong Owner: DIC Vietnam Co., Ltd Construction Terms: Nov-2005 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Chemical manufacturing and printing material plants operate under high-risk classifications due to the presence of volatile compounds and sensitive thermal processes. Kurihara Vietnam, acting as the premier factory […]

Saigon Centre 2&3 (Special Lighting)

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Saigon Centre 2&3 (Special Lighting) Location: Ho Chi Minh Owner: Kepple Land Wattco II & III Construction Terms: Sep-2017 Main Contractor: Hoa Binh Construction Group JSC Classification of Works: Special lighting Works Project Outline: Office High-end commercial mega-structures require specialized architectural illumination to define their iconic status and elevate guest experiences. Kurihara Vietnam was […]

Savico Plaza Hanoi-Block B

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Savico Plaza Hanoi-Block B Location: Hanoi Owner: Savico Hanoi JSC Construction Terms: April-2010 to Jun-2011 Main Contractor: N/A Classification of Works: M&E works Project Outline: Office Building Engineering MEP systems for high-occupancy commercial plazas demands heavy utility resilience, smart energy conservation workflows, and absolute life-safety compliance. Kurihara Vietnam delivered integrated building M&E contractor system […]

Park Hyatt Saigon Luxury Hotel Redefinition

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Park Hyatt Saigon Luxury Hotel Redefinition Location: Ho Chi Minh Owner: Grand Imperial Saigon Hotel (GISH) Construction Terms: Oct-2015 Main Contractor: Direct contract with Developer (GISH). Builder was VICON, ID Contractor was AA. Classification of Works: M&E works Project Outline: Hotel & Resort Delivering luxury guest experiences requires invisible yet highly efficient mechanical systems. […]

Intercontinental Resort & Spa Danang

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Intercontinental Resort & Spa Danang Location: Da Nang Owner: Sun Group / Terra Joint Stocks Company Construction Terms: Sep-2013 Main Contractor: N/A Classification of Works: M&E works Project Outline: Hotel & Resort Engineering mechanical and electrical frameworks for global award-winning ultra-luxury retreats leaves absolute zero room for compromise. Kurihara Vietnam operated as the specialized […]

The Sheraton Sai Gon Hotel & Grand Tower 3

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: The Sheraton Sai Gon Hotel & Grand Tower 3 Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: Oct-2005 Main Contractor: Dung Tien Construction Co., Ltd Classification of Works: M&E works Project Outline: Hotel & Resort Renovating and optimizing the mechanical, electrical, and piping frameworks for a prominent, operating 5-star hospitality […]

Celadon City Ruby (Block C)

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Celadon City Ruby (Block C) Location: Ho Chi Minh Owner: Sai Gon Thuong Tin Tan Thang Investment Real Estate JSC Construction Terms: Aug-2015 To Sep-2017 Main Contractor: Dung Tien Construction Co., Ltd Classification of Works: Electrical works Developing technical infrastructure for modern eco-townships requires a strong focus on structural safety, resource conservation, and long-term […]

Crowne Plaza Nha Trang

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Crowne Plaza Nha Trang (Residence) Location: Nha Trang Owner: TD Corporation Construction Terms: Dec-2011 To Dec-2014 Main Contractor: Cofico Classification of Works: Electrical works Project Outline: Hotel & Resort Developing and executing the mechanical, electrical, and piping infrastructure for a premium beachfront hospitality development requires elite engineering adaptations, especially in heavy anti-corrosion material selection […]

The Estella Residential Development

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: The Estella Residential Development Location: Ho Chi Minh Owner: Keppel Land & Tien Phuoc Co., Ltd Construction Terms: Mar-2009 To Nov-2011 Main Contractor: Investco Corporation Classification of Works: Electrical works Project Outline: Apartment Executing the mechanical and electrical technical infrastructure for premium international residential compounds requires strict adherence to global engineering standards, durable component […]

Riviera Point (Block 3,4,5)

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Riviera Point (Block 3,4,5) Location: Ho Chi Minh Owner: Riviera Point Liability Company Limited (RP) Construction Terms: June-2012 To Dec-2014 Main Contractor: Ssangyong Engineering & Construction Co., Ltd Classification of Works: P&S and ACMV Works Project Outline: Apartment Executing specialized mechanical utility infrastructure for premium waterfront residential compounds requires advanced fluid logistics, strict noise […]

Ciputra Hanoi – Plot D1&D4

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Ciputra Hanoi – Plot D1&D4 Location: Hanoi Owner: COFICO Construction Terms: Aug-2003 To June-2006 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Apartment Engineering specialized mechanical and electrical infrastructure for premium international townships requires advanced hydraulic logistics, heavy-duty operational resilience, and highly energy-efficient thermal solutions. Kurihara Vietnam was appointed to execute the […]

Takagi Vietnam Factory Phase 1&2

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Takagi Vietnam Factory Phase 1&2 Location: Hung Yen Owner: Takagi Vietnam Co., Ltd. Construction Terms: May-2009 To Jul-2012 Main Contractor: Sumitomo Mitsui Construction, Fujita Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing multi-phase technical infrastructure for specialized manufacturing hubs requires high scalability, continuous load stability, and strict resource management layouts. Kurihara Vietnam, […]

Sews-Component Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Sews-Component Vietnam Factory Location: Hanoi Owner: SEWS-Components Vietnam Co., Ltd Construction Terms: Dec-2010 To Sep-2011 Main Contractor: Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Manufacturing technical infrastructures for automotive electronics and precision wire harness lines demands an elite engineering framework, featuring robust electrostatic discharge (ESD) mitigation, continuous power voltage stability, and […]

Pegasus Vietnam Phase II Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Pegasus Vietnam Phase II Factory Location: Hai Duong Owner: Pegasus Vietnam Co., Ltd Construction Terms: Nov-2010 To June-2011 Main Contractor: Fujita Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Executing multi-phase technical expansions for specialized industrial textile and high-load production hubs demands excellent scalability, continuous load stability, and heavy-duty dust management layouts. Kurihara […]

Vinax 5 Sanitary Ware Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Vinax 5 Sanitary Ware Factory Location: Hai Duong Owner: Inax Vietnam Sanitary Ware Co., Ltd Construction Terms: Aug-2009 To May-2010 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for modern ceramic firing and high-volume sanitary ware production hubs demands superior power grid resilience, heavy-duty fluid dynamics, and […]

Bunka Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Bunka Vietnam Factory Location: Hai Duong Owner: Bunka Vietnam Co., Ltd Construction Terms: Jun-2009 To Dec-2010 Main Contractor: Fujita Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced metal fabrication, heavy stamping, and industrial powder coating lines demands premium power grid resilience, heavy-duty fluid dynamics, and rigid safety control […]

Coca Cola Beverage Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Location: Ho Chi Minh Owner: Coca Cola Beverage Vietnam Limited Construction Terms: Oct-2009 To Mar-2010 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced Food & Beverage (F&B) production hubs, automated blending basements, and ultra-high-speed bottling lines demands premium electrical resilience, heavy-duty fluid logistics, and strict sanitary engineering […]

Nhieu Loc Thi Nghe Pump Station

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Nhieu Loc Thi Nghe Pump Station Location: Ho Chi Minh Owner: Hynndai Mobis Construction Terms: Sep-2009 Main Contractor: N/A Classification of Works: Mechanical Works Project Outline: Factory-Plant Civil environmental and municipal infrastructure developments demand absolute technical resilience, heavy-duty fluid logistics, and strict material endurance against highly corrosive environments. Kurihara Vietnam successfully deployed its elite […]

Intel Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Intel Factory Location: Ho Chi Minh Owner: Intel Corporation Construction Terms: Sep-2007 To Sep-2009 Main Contractor: Taisei Corporation Classification of Works: Mechanical/BMS Works Project Outline: Factory-Plant Constructing and integrating technical infrastructure for global semiconductor giants demands extreme technical compliance, ultra-precise calibrations, and smart automated environmental controls. Kurihara Vietnam deployed its elite automation and mechanical […]

3A Pharmaceutical Warehouse Da Nang

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: 3A Pharmaceutical Warehouse Da Nang Location: Da Nang Owner: 3A Pharmaceutical Co., Ltd Construction Terms: April-2007 To Sep-2007 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Engineering a mechanical and electrical infrastructure for modern medical cold chains and pharmaceutical distribution hubs leaves absolutely zero margin for climate fluctuations. Kurihara Vietnam deployed […]

Fujikin Thang Long Production Works

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Fujikin Thang Long Production Works Location: Hanoi Owner: Fujikin Vietnam Co., Ltd Construction Terms: Dec-2014 to Dec-2014, Oct-2016 to Feb-2017, June-2017 to Mar-2018 Main Contractor: Fujikin Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced micro-fluidic device manufacturing and cleanroom-grade semiconductor component assembly requires an elite engineering […]

Inoac New Production Area Works

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Inoac New Production Area Works Location: Hanoi Owner: Inoac Vietnam Co. Ltd Construction Terms: Feb-2020 to July-2020 Main Contractor: Nakano Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure within an operating facility’s new manufacturing extension demands flexible load scheduling, continuous sub-station stability, and heavy chemical environmental management […]

Suzuran Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Suzuran Vietnam Factory Location: Hung Yen Owner: Suzuran Vietnam Co., Ltd Construction Terms: Aug-2018 Main Contractor: Tokura Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for sensitive medical textile processing, automated sterile packaging, and certified cleanroom manufacturing environments demands superior power grid resilience, heavy-duty fluid logistics, and high-precision process ventilation […]

Kuroda Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kuroda Factory Location: Hai Duong Owner: Kuroda Kagaku (Viet Nam) Co., Ltd Construction Terms: Aug-2019 to May-2020 Main Contractor: Vinata International Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced micro-component processing, high-speed metal stamping, and automated electronic assembly lines demands an elite engineering framework. This includes robust […]

Rhythm Precision Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Rhythm Precision Vietnam Factory Location: Hanoi Owner: Rhythm Precision Vietnam Co., Ltd Construction Terms: Mar-2015 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced micro-machining, precision thermoplastic injection molding, and automated electronic assembly lines demands an elite engineering framework. This infrastructure must feature robust electrostatic discharge […]

Inoac Production Machine Works

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Inoac Production Machine Works Location: Hanoi Owner: Inoac Vietnam Co. Ltd Construction Terms: April-2019 to Dec-2019 Main Contractor: Inoac Vietnam Co. Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Executing mechanical and electrical utility infrastructure for heavy-duty production machinery, automated chemical-foaming molds, and precision industrial cutting lines demands flawless load scheduling, absolute technical […]

Enkei Factory – Renovation Works

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Enkei Factory – Renovation Works Location: Hanoi Owner: Enkei Vietnam Co., Ltd Construction Terms: April-2019 to Feb-2020 Main Contractor: Zenitaka Corporation/Enkei Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-temperature aluminum melting, high-pressure mold casting, and continuous automated CNC machining lines demands superior power grid resilience, […]

Pentstudio Tay Ho

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Pentstudio Tay Ho Location: Hanoi Owner: CTX Holdings Construction Terms: May-2018 to Dec-2020 Main Contractor: Vietnam Investment Construction and Trading Joint Stock Corporation (CTX Holdings) Classification of Works: M&E Works Project Outline: Apartment Developing the mechanical and electrical technical infrastructure for international-standard boutique condominiums requires high-end engineering frameworks, strict acoustic management, and high-efficiency utility […]

Unilever Homebase

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Unilever Homebase Location: Ho Chi Minh Owner: Unilever Vietnam International Company Limited Construction Terms: June-2019 to Sep-2020 Main Contractor: N/A Classification of Works: M&E works Project Outline: Apartment Engineering integrated mechanical and electrical technical frameworks for global multi-national corporate headquarters demands excellent resource conservation layouts, strict indoor environmental quality, and seamless modern architectural integration. […]

Park Hyatt SG

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Park Hyatt SG Location: Ho Chi Minh Owner: Grand Imperial Saigon Hotel Limited Liability Company Construction Terms: May-2019 to Jan-2020 Main Contractor: N/A Classification of Works: M&E works Project Outline: Hotel & Resort Engineering and delivering the mechanical, electrical, and piping frameworks for a world-renowned, fully operational 5-star hospitality landmark demands the absolute highest […]

Estella Heights Phase 2

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Estella Heights Phase 2 Location: Ho Chi Minh Owner: Estella Joint Venture Co., Ltd Construction Terms: Oct-2016 to Mar-2019 Main Contractor: Cofico Classification of Works: MEP works Project Outline: Apartment Engineering and synchronizing a comprehensive turnkey MEP infrastructure for modern high-rise eco-luxury complexes requires elite cross-functional master planning, precise 3D spatial mapping, and strict […]

Yasufuku Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Yasufuku Vietnam Factory Location: Hanoi Owner: Yasufuku Vietnam Co., Ltd Construction Terms: Dec-2003 to Sep-2004 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for high-temperature rubber vulcanization, advanced industrial polymer compounding, and automated precision molding lines demands superior power grid resilience, heavy-duty fluid dynamics, […]

Yamaha Motor Vietnam 2nd Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Yamaha Motor Vietnam 2nd Factory Location: Hanoi Owner: Yamaha Motor Vietnam Co., Ltd Construction Terms: May-2007 to April-2009 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced metal processing, high-precision robotic welding lines, heavy stamping, and high-volume automated paint shop facilities demands superior power […]

Yamaha Motor Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Yamaha Motor Vietnam Factory Location: Hanoi Owner: Yamaha Motor Vietnam Co., Ltd Construction Terms: Aug-2004 to Nov-2004 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced metal processing, high-precision robotic welding lines, heavy stamping, and high-volume automated paint shop facilities demands superior power grid […]

Yabashi Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Yabashi Vietnam Location: Hanoi Owner: Yabashi Vietnam CAD Technology Corporation Construction Terms: Nov-2004 to Apr-2005 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced metal processing, high-precision structural steel fabrication, and automated machinery assembly lines demands premium power grid resilience, […]

Wooree Vina Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Wooree Vina Factory Location: Vung Tau Owner: Wooree Vina Co., Ltd Construction Terms: Nov-2001 to Sep-2002 Consultant: N/A Main Contractor: N/A Classification of Works: Mechanical Works (ACMV System) Project Outline: Factory-Plant Engineering and installing high-performance central cooling structures and specialized micro-climate ventilation grids for tech-heavy manufacturing plants leaves absolute zero margin for error. Kurihara […]

Vietnam Steel Products

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Vietnam Steel Products Location: Vung Tau Owner: Vietnam Steel Products Co., Ltd Construction Terms: Jan-2001 to June-2001 Consultant: Sumitomo Metal Indutries Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-capacity metal slitting lines, heavy-duty overhead crane configurations, and continuous automated steel shearing processes demands superior […]

Vietnam Glass Industries

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Vietnam Glass Industries Location: Vung Tau Owner: Vietnam Float Glass Co., Ltd Construction Terms: Mar-2007 to Aug-2007 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous high-temperature glass melting kilns, automated float glass forming ribbons, and precision laser cutting lines demands superior power grid […]

Float Glass Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Float Glass Vietnam Location: Bac Ninh Owner: Vietnam Float Glass Co., Ltd Construction Terms: Jan-1998 to September-1998 Consultant: N/A Main Contractor: Vietnam Float Glass Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous high-temperature glass melting furnaces, advanced floating ribbon formations, and high-speed precision cutting lines demands […]

Vietnam Coating

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Vietnam Coating Location: Vung Tau Owner: Bluescope Steel Vietnam Co., Ltd Construction Terms: Jun-2004 to Jul-2006 Consultant: Scotte Lincoln Main Contractor: Leigton Contractors Asia Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for high-capacity electrostatic powder coating lines, chemical surface preparation baths, and continuous automated thermal baking […]

Vietnam Brewery Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Vietnam Brewery Factory Location: Ho Chi Minh Owner: Vietnam Brewery Co., Ltd Construction Terms: May-2005 to November-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced Food & Beverage (F&B) processing plants, automated fermentation basements, and ultra-high-speed bottling lines demands premium electrical resilience, heavy-duty […]

United Garment Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: United Garment Factory Location: Binh Duong Owner: United Garment Vietnam Co., Ltd Construction Terms: Sep-2002 to Feb-2003 Consultant: Jurutera Sinarunding Aidil Main Contractor: Architect & Construction Service Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for large-scale garment assembly sectors, high-load industrial cutting tables, and massive warehouse facilities […]

UMC Electronic Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: UMC Electronic Vietnam Factory Location: Hai Duong Owner: UMC Electronic Vietnam Construction Terms: Jul-2007 to Jul-2008 Consultant: N/A Main Contractor: Hazama Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for high-density Surface Mount Technology (SMT) lines, precision micro-soldering cells, and cleanroom-grade electronic assembly zones demands an elite engineering framework. This […]

Toyo Ink Production

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Toyo Ink Production Location: Bac Ninh Owner: Toyo Ink Compound VN Co., Ltd Construction Terms: Jun-2007 to Jun-2008 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy chemical blending, high-load material milling lines, and volatile fluid logistics demands superior […]

Toyoda Giken Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Toyoda Giken Vietnam Location: Hanoi Owner: Toyoda Giken Vietnam Co., Ltd Construction Terms: Dec-2005 to Jul-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced automotive component fabrication, continuous metal stamping, and specialized chemical surface treatment lines demands superior power […]

Toto Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Toto Vietnam Factory Location: Hanoi Owner: TOTO Vietnam Co., Ltd Construction Terms: Dec-2002 to July-2004 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing modern technical infrastructure for continuous heavy ceramic firing, automated high-pressure casting cells, and precise fluid testing lines demands superior power grid resilience, heavy-duty fluid dynamics, […]

Thu Duc Boo Water treatment plant

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Thu Duc Boo Water treatment plant Location: Ho Chi Minh Owner: Thu Duc Boo Water Treatment Plant Co., Ltd Construction Terms: Jan-2007 to Mar-2009 Consultant: N/A Main Contractor: Huyndai Mobis Classification of Works: M&E Works Project Outline: Factory-Plant Civil clean-water distribution and municipal infrastructure developments demand absolute technical resilience, heavy-duty fluid logistics, and strict […]

Thang Long Logistics Center

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Thang Long Logistics Center Location: Hanoi Owner: Thang Long Logistics Co., Ltd Construction Terms: Mar-2002 to Aug-2002 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for mega-scale logistics hubs, automated racking vaults, and high-density multi-user fulfillment centers demands excellent scalability, continuous power […]

Goshi ThangLong Auto Parts Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Goshi ThangLong Auto Parts Factory Location: Hanoi Owner: Goshi Thang Long Auto Parts Co., Ltd Construction Terms: Mar-2006 to Sep-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-capacity metal stamping presses, automated robotic welding cells, and heavy-duty paint shop […]

Swire Cold Storage Project

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Swire Cold Storage Project Location: Binh Duong Owner: Swire Cold Pacific Co., Ltd Construction Terms: May-2005 to Dec-2005 Consultant: N/A Main Contractor: Beca Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a resilient technical infrastructure for global medical and food cold chains leaves absolutely zero margin for power fluctuations or thermal variations. Kurihara […]

Suncall Technology Vietnam Factory – Phase 2

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Suncall Technology Vietnam Factory – Phase 2 Location: Hanoi Owner: Suncall Technology Vietnam Co., Ltd Construction Terms: Jan-2005 to Jul-2005 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure within an active, live manufacturing facility’s new extension demands flexible structural planning, high-scalability load diagnostics, […]

Sumitomo Heavy Industries

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Sumitomo Heavy Industries Location: Hanoi Owner: Sumitomo Heavy Industries Vietnam Co., Ltd Construction Terms: Sep-2006 to Jun-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-capacity continuous industrial metal processing, advanced robotic machining centers, and heavy heat-treatment lines demands superior […]

Sumirubber Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Sumirubber Vietnam Location: Hai Phong Owner: Sumirubber Hybrid Vietnam Vietnam Co., Ltd Construction Terms: Mar-2006 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous automated rubber dipping lines, high-temperature mold vulcanization, and massive chemical-compounding matrices demands superior power […]

Stanley Electric Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Stanley Electric Vietnam Factory Location: Hanoi Owner: Stanley Electric Vietnam Co., Ltd Construction Terms: Jan-2005 to Sep-2005 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced optical plastic injection molding, high-vacuum chemical metallization, and automated Surface Mount Technology (SMT) packaging lines […]

San Miguel Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: San Miguel Vietnam Factory Location: Dong Nai Owner: San Miguel Vietnam Factory Construction Terms: Jul-2005 to Aug-2006 Consultant: N/A Main Contractor: Architect Construction Service Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced Food & Beverage (F&B) processing hubs, automated formulation basements, and ultra-high-speed bottling/packaging lines demands […]

Ryonan Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Ryonan Vietnam Factory Location: Hanoi Owner: Ryonan Electric Vietnam Co., Ltd Construction Terms: Oct-2003 to Sep-2004 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing technical infrastructure for advanced electronic wire harness layouts, multi-stage micro-soldering cells, and cleanroom-grade electronic assembly zones demands an elite engineering […]

Nagatsu Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Nagatsu Vietnam Location: Hanoi Owner: Nagatsu Vietnam Co., Ltd Construction Terms: Nov-2007 to June-2008 Consultant: T&E Consultant Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Developing and upgrading technical infrastructure for critical midstream petrochemical complexes and natural gas processing plants leaves absolutely zero margin for voltage drops, technical friction, […]

Mekong Flour Mills

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Mekong Flour Mills Location: Vung Tau Owner: Mekong Flour Mills Vietnam Co., Ltd Construction Terms: July-2002 to Feb-2003 Consultant: T&E Consultant Main Contractor: T/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for multi-stage high-tonnage grain milling towers, high-capacity automated screening lines, and continuous silo material handling conveyor systems demands […]

Meisei Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Meisei Vietnam Location: Vinh Phuc Owner: Meisei Vietnam Co., Ltd Construction Terms: Mar-2006 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous automated thermoplastic injection molding, precision CNC machinery lines, and cleanroom-grade electronic packaging floors leaves absolutely zero […]

Marumitsu Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Marumitsu Vietnam Location: Vinh Phuc Owner: Marumitsu Vietnam Co., Ltd Construction Terms: Mar-2004 to Sep-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced automotive component fabrication, continuous metal stamping, and specialized mechanical processing lines demands superior power grid resilience, heavy-duty fluid dynamics, and […]

Kuroda Kagaku Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kuroda Kagaku Vietnam Location: Hai Duong Owner: Kuroda Kagaku Vietnam Co., Ltd Construction Terms: Oct-2006 to July-2007 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy thermoplastic injection molding, automated high-precision CNC machinery lines, and rigid mold fabrication cells […]

Kishiro Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kishiro Vietnam Factory Location: Hanoi Owner: Kishiro Vietnam Co., Ltd Construction Terms: Oct-2006 to May-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous ultra-precision metal lathe processing, advanced CNC grinding centers, and automated micro-component assembly lines leaves absolutely zero […]

Kian Joo Can Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kian Joo Can (Vietnam) Factory Location: Binh Duong Owner: Kian Joo Can Vietnam Co., Ltd Construction Terms: Sep-2002 to Nov-2003 Consultant: N/A Main Contractor: Kian Joo Can Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for high-speed metal extrusion, precision tin plate stamping, and massive continuous lacquer thermal baking ovens […]

Kayaba Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kayaba Vietnam Location: Hanoi Owner: Kayaba Vietnam Co., Ltd Construction Terms: Dec-2002 to Mar-2003 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: Mechanical Works Project Outline: Factory-Plant Integrating heavy mechanical plant infrastructure and precision fluid dynamics for automated automotive assembly loops leaves absolutely zero margin for technical friction or micro-thermal variations. Kurihara Vietnam […]

Kao Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Kao Vietnam Factory Location: Dong Nai Owner: Kao Vietnam Co., Ltd Construction Terms: June-1996 to Feb-1997 Consultant: N/A Main Contractor: N/A Classification of Works: Mechanical Works Project Outline: Factory-Plant Integrating heavy mechanical plants, hygienic processing utilities, and multi-zone climate regulations for global FMCG and personal care manufacturing hubs demands flawless fluid contractor engineering layouts, […]

Jotun Paints Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Jotun Paints Vietnam Location: Binh Duong Owner: Jotun Paints Vietnam Co., Ltd Construction Terms: May-2004 to Feb-2006 Consultant: Haskoning Vietnam Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy chemical blending, high-load material milling lines, and volatile fluid logistics demands superior power grid resilience, heavy-duty […]

Jebsen & Jessen Broadway Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Jebsen & Jessen Broadway Vietnam Location: Bac Ninh Owner: Jebsen & Jessen Broadway Vietnam Co., Ltd Construction Terms: Mar-2006 to Oct-2006 Consultant: Viet Architect Main Contractor: Him Lam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy thermoplastic injection molding, automated material compounding lines, and high-capacity […]

Iritani Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Iritani Vietnam Location: Hanoi Owner: Iritani Vietnam Co., Ltd Construction Terms: Dec-2005 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a turnkey technical infrastructure for continuous heavy metal stamping presses, high-speed automated CNC grinding cells, and specialized structural mechanical assembly lines demands […]

InterFlour Mills Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: InterFlour Mills Vietnam Location: Vung Tau Owner: Vietnam Flour Mills Co., Ltd Construction Terms: Jan-2002 to Oct-2003 Consultant: COFICO Main Contractor: Raymond Woo & Assc Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a turnkey technical infrastructure for multi-stage high-tonnage agricultural milling towers, automated high-speed grain screening systems, and continuous pneumatic silo material […]

Ikeuchi Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Ikeuchi Vietnam Location: Hanoi Owner: Ikeuchi Vietnam Co., Ltd Construction Terms: July-2007 to Aug-2007 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous ultra-precision metal lathe processing, advanced automated CNC milling cells, and specialized high-pressure fluid testing blocks leaves absolutely zero margin […]

Honest Vietnam

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Honest Vietnam Location: Vinh Phuc Owner: Honest Vietnam Co., Ltd Construction Terms: Aug-2006 to Jun-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous automated high-precision component molding, rapid assembly sectors, and cleanroom-grade electronic packaging lines leaves absolutely zero margin […]

Hansae Garment Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Hansae Garment Factory Location: Ho Chi Minh Owner: Hansae (Vietnam) Co., Ltd Construction Terms: Nov-2001 to Dec-2002 Consultant: Cideco Co., Ltd Main Contractor: A&B Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for massive garment assembly sectors, high-load industrial cutting tables, and heavy-capacity shipping and warehousing zones demands […]

Hanoi Metal One Steel Center Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Hanoi Metal One Steel Center Factory Location: Hai Duong Owner: Hanoi Metal One Steel Center Co., Ltd Construction Terms: Dec-2006 to Jun-2007 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-capacity heavy metal slitting lines, continuous automated steel shearing processes, […]

Fujikin Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Fujikin Vietnam Factory Location: Hanoi Owner: Sumitomo Mitsui Construction Co., Ltd Construction Terms: July-2005 to Sep-2006 Consultant: Sumitomo Mitsui Construction Co., Ltd Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous ultra-precision metal lathe processing, semiconductor-grade micro-component assembly zones, and high-purity fluid […]

F&N Vietnam Foods

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: F&N Vietnam Foods Location: Binh Duong Owner: F&N Vietnam Foods Co., Ltd Construction Terms: Nov-2002 to Sep-2003 Consultant: F&N Vietnam Co., Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced Food & Beverage (F&B) formulation cells, automated pasteurization networks, and high-speed filling lines demands premium […]

Enkei Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Enkei Vietnam Factory Location: Hanoi Owner: The Zenitaka Corporation Construction Terms: Feb-2008 to July-2009 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for high-temperature aluminum melting kilns, high-pressure mold casting layouts, and continuous automated CNC machining lines demands superior power grid resilience, heavy-duty […]

Endo Stainless Steel Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Endo Stainless Steel Vietnam Factory Location: Hanoi Owner: Sumitomo Mitsui Construction Co., Ltd Construction Terms: Nov-2007 to May-2008 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a turnkey technical infrastructure for continuous heavy metal forging, high-speed automated CNC grinding cells, and specialized stainless steel […]

DIC Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: DIC Vietnam Factory Location: Binh Duong Owner: Shimizu Corporation Construction Terms: July-2005 to Nov-2005 Consultant: N/A Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy chemical blending, high-load material milling lines, and volatile fluid logistics demands superior power grid resilience, heavy-duty fluid dynamics, and […]

Box Pak Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Box Pak Vietnam Factory Location: Binh Duong Owner: Box Pak Vietnam Co., Ltd Construction Terms: Nov-2003 to Nov-2004 Consultant: N/A Main Contractor: Trung Dung Construction Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for heavy high-speed paper corrugating networks, automated slotter-creaser machinery grids, and massive continuous print thermal baking layouts […]

Bemac Panels Manufacturing Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Bemac Panels Manufacturing Vietnam Factory Location: Hanoi Owner: Vinata International J.V Co., Ltd Construction Terms: July-2004 to July-2005 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for continuous heavy electrical panel customization, multi-stage micro-wiring blocks, and cleanroom-grade electronic packaging floors leaves […]

Beautec Garment Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Beautec Garment Factory Location: Binh Duong Owner: Beautec Garment Factory Construction Terms: Sep-2002 to October-2003 Consultant: CIDECO Main Contractor: A&B Interior Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for massive garment assembly blocks, high-load industrial fabric cutting lines, and heavy-capacity shipping and warehousing zones demands excellent power grid resilience, […]

Amway Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Amway Vietnam Factory Location: Dong Nai Owner: Amway Vietnam Factory Construction Terms: Jan-2007 to August-2007 Consultant: Delta Construction Management Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for advanced pharmaceutical-grade formulation cells, dust-controlled powder blending blocks, and high-speed packaging lines demands premium electrical resilience, heavy-duty fluid logistics, […]

Amanda Foods Vietnam Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Amanda Foods Vietnam Factory Location: Dong Nai Owner: Amanda Foods Vietnam Factory Construction Terms: Mar-2003 to May-2004 Consultant: Amigos Main Contractor: Amigos, Indochine engineering Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for international-standard seafood processing hubs, high-load IQF flash-freezing lines, and massive sub-zero refrigeration vaults demands premium electrical resilience, […]

Alpha Industries Factory

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: Alpha Industries Factory Location: Hanoi Owner: Vinata International J.V Co., Ltd Construction Terms: July-2005 to Sep-2006 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant Constructing a technical infrastructure for continuous heavy metal stamping presses, high-speed automated CNC grinding cells, and specialized structural mechanical assembly lines […]

3A Pharmaceutical WareHouse

  • Client: Factory-Plant
  • Year completed: 2020
  • Project leader: kurihara

Project: 3A Pharmaceutical WareHouse Location: Ho Chi Minh Owner: 3A Pharmaceutical Co., Ltd Construction Terms: July-2006 to Mar-2007 Consultant: J Roger Preston Vietnam Co., Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant Constructing integrated technical infrastructure for pharmaceutical-grade logistics hubs and temperature-sensitive medical distribution centers leaves absolute zero margin for thermal […]

Hyatt Regency Danang Resort and Spa Hotel

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Hyatt Regency Danang Resort and Spa Hotel Location: Da Nang Owner: Marble Mountain Beach Resort JS Company Construction Terms: Nov-2004/2005 to Dec-2006 Consultant: Indochine Engineering Vietnam Ltd Main Contractor: Contec Construction Joint Stock Company Classification of Works: M&E Works Project Outline: Hotel & Resort Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for […]

Sheraton AA,Maintenance

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Sheraton AA,Maintenance Location: Ho Chi Minh Owner: Ocean Place JV Co., Ltd Construction Terms: Nov-2004/2005 to Dec-2006 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Hotel Executing systematic mechanical maintenance, electrical infrastructure calibration, and energy-saving thermal overhauls for a fully live, high-occupancy 5-star hospitality landmark leaves absolute zero margin for […]

Vung Tau P&T Hotel

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Vung Tau P&T Hotel Location: Vung Tau Owner: Vietnam Telecom Company Construction Terms: Feb-1999 to Sep-2000 Consultant: Vietnam Thermos Main Contractor: TRACODI., Ltd Classification of Works: M&E Works Project Outline: Hotel Developing the mechanical and electrical technical infrastructure for premium coastal hotels demands high-level protection against marine salt-spray corrosion, rigid indoor relative humidity (RH) […]

The Sheraton Sai Gon Hotel & Grand Tower

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: The Sheraton Sai Gon Hotel & Grand Tower Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: Nov-2004 to Oct-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Hotel Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for an iconic high-rise 5-star hospitality landmark in a […]

Sofitel Plaza Hanoi

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Sofitel Plaza Hanoi (Westiake International Hotel) Location: Hanoi Owner: Sofitel Plaza Hanoi Co., Ltd Construction Terms: Jan-2003 to June-2003 Consultant: N/A Main Contractor: AA Corporation Classification of Works: M&E Works Project Outline: Hotel Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for an iconic high-rise 5-star hotel in a culturally sensitive, prominent lakeside […]

Novotel Garden Plaza

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Novotel Garden Plaza Location: Ho Chi Minh Owner: Ssangyong Engineering & Construction Co., Ltd Construction Terms: May-2004 to April-2005 Consultant: Meinhartd Main Contractor: AA Corporation Classification of Works: M&E Works Project Outline: Hotel Engineering and delivers heavy-duty, highly efficient mechanical and electrical technical infrastructure for strategic airport-gateway hotels requires excellent spatial layout optimization, superior […]

Hanoi Hotel Extension

  • Client: Hotel & Resort
  • Year completed: 2020
  • Project leader: kurihara

Project: Hanoi Hotel Extension Location: Hanoi Owner: Hanoi Hotel Construction Terms: Nov-1995 to March-1997 Consultant: V.Best Consultant Co., Ltd Main Contractor: Hanoi Hotel Classification of Works: Coordination Works,Electrical Works, Fire Protection System Project Outline: Hotel Engineering and delivers heavy-duty, highly efficient mechanical and electrical technical infrastructure for strategic airport-gateway hotels requires excellent spatial layout optimization, […]

Metro C&C HyperMarket

  • Client: HyperMarket
  • Year completed: 2020
  • Project leader: kurihara

Project: Metro C&C HyperMarket Location: Hanoi Owner: Metro C&C Hypermarket VN Ltd Construction Terms: April-2003 to July-2003 Consultant: AGG Co. Main Contractor: Axima Klampfer Standley Co., Ltd. Classification of Works: M&E Works Project Outline: Hypermarket Engineering and delivering a integrated mechanical and electrical technical infrastructure for large-scale wholesale hypermarkets demands excellent facility layout optimization, heavy-duty […]

Metro C&C HyperMarket District 6

  • Client: HyperMarket
  • Year completed: 2020
  • Project leader: kurihara

Project: Metro C&C HyperMarket District 6 Location: Ho Chi Minh Owner: Metro C&C Hypermarket VN Ltd Construction Terms: Dec-2001 to April-2002 Consultant: AGG Co. Main Contractor: Klampler & Axima Standley Co., Ltd Classification of Works: M&E Works Project Outline: Hypermarket Engineering and delivering an integrated mechanical and electrical technical infrastructure for large-scale wholesale hypermarkets demands […]

Metro C&C HyperMarket District 2

  • Client: HyperMarket
  • Year completed: 2020
  • Project leader: kurihara

Project: Metro C&C HyperMarket District 2 Location: Ho Chi Minh Owner: Metro C&C Hypermarket VN Ltd Construction Terms: Aug-2002 to Feb-2003 Consultant: AGG Co. Main Contractor: Klampler & Axima Classification of Works: M&E Works Project Outline: Hypermarket Engineering and delivering an integrated mechanical and electrical technical infrastructure for large-scale wholesale hypermarkets demands excellent facility layout […]

Cho Ray Hospital

  • Client: Hospital
  • Year completed: 2020
  • Project leader: kurihara

Project: Cho Ray Hospital Location: Ho Chi Minh Owner: Cho Ray Hospital Construction Terms: Dec-2001 to Mar-2002 Consultant: AXS Main Contractor: JICA Classification of Works: Mechanical Works (P&S System) Project Outline: Hospital Engineering and upgrading primary plumbing and sanitary technical infrastructures for active, high-density national medical facilities leaves absolute zero margin for pressure drops or […]

Hanoi French Hospital

  • Client: Hospital
  • Year completed: 2020
  • Project leader: kurihara

Project: Hanoi French Hospital Location: Hanoi Owner: French Hospital Construction Terms: April-2002 to Nov-2003 Consultant: Sacidelta Construction J.V, Ltd Main Contractor: APAVE J.V Co., Ltd Classification of Works: M&E Works Project Outline: Hospital Engineering and delivering a integrated mechanical and electrical technical infrastructure for active international hospitals demands flawless cross-functional precision, absolute reliability, and zero-compromise […]

United Nations International School

  • Client: School
  • Year completed: 2020
  • Project leader: kurihara

Project: United Nations International School Location: Hanoi Owner: UNIS Construction Terms: Feb-2007 to Feb-2008 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: School Engineering and delivering an integrated mechanical and electrical technical infrastructure for premium international educational facilities demands exceptional spatial coordination, strict acoustic management, and world-class health and safety parameters. […]

Can Tho University Resource Center

  • Client: School
  • Year completed: 2020
  • Project leader: kurihara

Project: Can Tho University Resource Center Location: Can Tho Owner: RMIT Vietnam Holding PTY Co., Ltd Construction Terms: Dec-2004 to April-2006 Consultant: Indochine Engineering Main Contractor: Hoa Binh Corporation Classification of Works: M&E Works Project Outline: School Engineering and delivering an integrated mechanical and electrical technical infrastructure for modern digital libraries and high-capacity academic information […]

ACG International School Vietnam

  • Client: School
  • Year completed: 2020
  • Project leader: kurihara

Project: ACG International School Vietnam Location: Ho Chi Minh Owner: Academic Collegue Groups Construction Terms: Apr-2007 to Nov-2007 Consultant: N/A Main Contractor: Tan Ky Co., Ltd Classification of Works: M&E Works Project Outline: School Engineering and delivering an integrated mechanical and electrical technical infrastructure for modern digital libraries and high-capacity academic information hubs demands exceptional […]

Vietcombank Tower

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Vietcombank Tower Location: Ha Noi Owner: Fels Construction Techniques Ltd Construction Terms: Jan-1999 to March-2001 Consultant: MEI Project Engineers PTE., Ltd Main Contractor: FELS Construction Techniques Limited Classification of Works: Heating, Ventilation & Air-conditioning Services Electrical Works, Fire Protection System Project Outline: Office Building Engineering and delivering integrated technical infrastructure for Grade-A financial headquarters […]

Thang long Industrial Park Center

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Thang long Industrial Park Center Location: Ha Noi Owner: Thang Long Industrial Park Co., Ltd Construction Terms: Oct-2001 to Aug-2002 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd. Classification of Works: M&E NetWorks Project Outline: Office Building Engineering and deploying integrated technical infrastructure for central industrial park command headquarters and administrative centers leaves […]

Hanoi Southern SwitchBoard

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Hanoi Southern SwitchBoard Location: Ha Noi Owner: Hanoi Post and Telecommunication Construction Terms: July-2001 to Mar-2002 Consultant: VNCC Company Main Contractor: N/A Classification of Works: Air-con System Telephone and Computer NetWorks Project Outline: Office Building Engineering and delivering integrated technical infrastructure for national telecom switchboard centers and carrier-grade data hubs leaves absolute zero margin […]

IVB Indovina Bank

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: IVB Indovina Bank Location: Ha Noi Owner: IVB Indovina Bank Construction Terms: Dec-2005 to Jan-2007 Consultant: N/A Main Contractor: N/A Classification of Works: M & E Works Project Outline: Office Building Engineering and delivering an integrated mechanical and electrical technical infrastructure for premier international financial headquarters and active banking hubs leaves absolute zero margin […]

Centre Point Office Building

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Centre Point Office Building Location: Ho Chi Minh Owner: Nguyen Vu Investment & Construction JSC Construction Terms: Jan-2008 to August-2009 Consultant: HBP/ICE Main Contractor: Coteccons Classification of Works: M & E Works Project Outline: 15 Storey Office Building, 44,853 sqm Engineering and delivering integrated technical infrastructure for international Grade-A eco-efficient office towers demands high-level […]

Bitexco Financial Tower

  • Client: Office Building
  • Year completed: 2020
  • Project leader: kurihara

Project: Bitexco Financial Tower Location: Ho Chi Minh Owner: Binh Minh Import Export Production & Trade Co., Ltd Construction Terms: July-2010 to June-2011 Consultant: Tuner Main Contractor: Hyundai E&C Classification of Works: M & E Works Project Outline: 68 Storey Office Building 42,600 sqm Engineering and delivering a integrated mechanical and electrical technical infrastructure for […]

Ha Tay Brewery

  • Client: Entertainment Center
  • Year completed: 2020
  • Project leader: kurihara

Project: Ha Tay Brewery Location: Ha Noi Owner: Hatay Brewery Co., Ltd Construction Terms: August-2003 to November-2003 Consultant: Chuchawal Main Contractor: N/A Classification of Works: M & E Works Project Outline: Entertainment Center Constructing integrated technical infrastructure for advanced Food & Beverage (F&B) processing plants, automated fermentation basements, and ultra-high-speed bottling lines demands premium electrical […]

Spring Court Apartment

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Spring Court Apartment Location: Ho Chi Minh Owner: Trang Anh Vinh Co., Ltd Construction Terms: May-2005 to 2006 Consultant: Indochine Engineering Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for high-end urban residential complexes demands a high level of technical […]

Sai Gon Hotel & Grand Tower

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Sai Gon Hotel & Grand Tower Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: November-2005 to December-2006 Consultant: JRP Co., Ltd Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for an iconic high-rise luxury hospitality landmark […]

Sky Garden

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Sky Garden Location: Ho Chi Minh Owner: Fujita Corporation Construction Terms: June-1996 to Jan-1998 Consultant: Acer Consultants Ltd Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for mega-scale urban residential townships demands high-level technical precision, strict acoustic management, and absolute […]

Rivera Villas

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Rivera Villas Location: Ho Chi Minh Owner: Sai Gon Rivera JV Co., Ltd Construction Terms: Oct-2008 to Dec-2009 Consultant: Hainal Konyi Main Contractor: Investco Classification of Works: M & E Works Project Outline: Apartment Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for luxury waterfront residential estates demands a high level of technical […]

Phu My Hung Apartment

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Phu My Hung Apartment Location: Ho Chi Minh Owner: Phu My Hung Corporation Construction Terms: Sep-2002 to Sep-2004 Consultant: Sino Pacific Main Contractor: Cofico Classification of Works: M & E Works Project Outline: Apartment Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for high-density modern residential townships demands excellent spatial layout optimization, strict […]

Hung Vuong Plaza

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Hung Vuong Plaza Location: Ho Chi Minh Owner: M & C Corporation and Others Construction Terms: Apr-2004 to May-2004 Consultant: AIC Consultant Main Contractor: M & C Corporation Co No.1 Classification of Works: M & E Works, design works Project Outline: Commercial Building and Apartment. Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure […]

Hanoi Tower Center

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Hanoi Tower Center Location: Ha Noi Owner: Hanoi Tower Center Co., Ltd. Construction Terms: Jun-1995 to Nov-1997 Consultant: Alpha Engineering Main Contractor: Ssangyong E&C Co.,Ltd. Classification of Works: Electrical Works Plumbing & Sanitary Works Project Outline: Apartment, Office Bldg 45,000 m2 Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for high-density mixed-use commercial […]

Ciputra Hanoi

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Ciputra Plot D1 & D4 Location: Ha Noi Owner: Citra West Lake Development Construction Terms: Aug-2003 to Jun-2006 Consultant: N/A Main Contractor: Cofico Classification of Works: M&E Works Project Outline: Resident House Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for high-density international residential townships demands excellent spatial layout coordination, strict acoustic dampening […]

Cantavil Apartment

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Cantavil Highrise Building Location: Ho Chi Minh Owner: Daewon Co., Ltd Construction Terms: May-2005 to Jun-2007 Consultant: CD Co. Classification of Works: M&E Works Project Outline: 118 Storey Apartment Bldg. Three Towers, 405 Units Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for high-density modern residential landmarks and commercial complex podiums demands excellent […]

Avalon Apartment

  • Client: Apartment
  • Year completed: 2020
  • Project leader: kurihara

Project: Avalon Apartment Location: Ho Chi Minh Owner: Avalon Saigon Co., Ltd Construction Terms: May-2005 to Oct-2006 Consultant: Indochine Engineering Classification of Works: M&E Works Project Outline: 12 Storey Apartment Bldg.64 Units Engineering and delivering full-scale mechanical, electrical, and plumbing infrastructure for luxury high-rise residential landmarks in high-density urban centers demands an elite level of […]