Beautec Garment Factory

INFORMATION

Client: Beautec Garment Factory
Location: Binh Duong
Year completed: October 2003
Category: Factory-Plant

description

Project: Beautec Garment Factory
Location: Binh Duong
Owner: Beautec Garment Factory
Construction Terms: Sep-2002 to October-2003
Consultant: CIDECO
Main Contractor: A&B Interior
Classification of Works: M&E Works
Project Outline: Factory-Plant

Constructing integrated technical infrastructure for massive garment assembly blocks, high-load industrial fabric cutting lines, and heavy-capacity shipping and warehousing zones demands excellent power grid resilience, complex air ventilation frameworks, and heavy-duty life-safety setups. Kurihara Vietnam, operating as the premier factory M&E contractor, successfully delivered the full-scale mechanical and electrical infrastructure for the high-tech Beautec Garment Factory in Binh Duong. Our technical execution focused on installing stable electrical distribution grids, high-volume factory cooling layouts, and certified fire protection networks under strict industrial codes to sustain uninterrupted multi-shift manufacturing schedules.