- Hanoi (+84-024) 3556 6394 | [email protected]
- HCM (+84-028) 3999 0841 | [email protected]
| Client: | Hanoi Metal One Steel Center Co., Ltd |
|---|---|
| Location: | Hai Duong |
| Year completed: | June 2007 |
| Category: | Factory-Plant |
Project: Hanoi Metal One Steel Center Factory
Location: Hai Duong
Owner: Hanoi Metal One Steel Center Co., Ltd
Construction Terms: Dec-2006 to Jun-2007
Consultant: N/A
Main Contractor: Vinata International J.V Co., Ltd
Classification of Works: M&E Works
Project Outline: Factory-Plant
Constructing a technical infrastructure for high-capacity heavy metal slitting lines, continuous automated steel shearing processes, and heavy-duty overhead crane configurations demands superior power grid resilience, durable structural layouts, and reliable safety controls. Kurihara Vietnam, operating as the premier factory M&E contractor, successfully delivered the full-scale mechanical and electrical factory infrastructure for the high-tech Hanoi Metal One Steel Center Factory in Hai Duong. Our execution focused on implementing high-performance power networks, heavy industrial utility piping, and efficient factory ventilation frameworks engineered under rigid Japanese technical compliance to sustain uninterrupted, multi-shift production schedules.