Suncall Technology Vietnam Factory – Phase 2

INFORMATION

Client: Suncall Technology Vietnam Co., Ltd
Location: Ha Noi
Year completed: July 2005
Category: Factory-Plant

description

Project: Suncall Technology Vietnam Factory – Phase 2
Location: Hanoi
Owner: Suncall Technology Vietnam Co., Ltd
Construction Terms: Jan-2005 to Jul-2005
Consultant: N/A
Main Contractor: The Zenitaka Corporation
Classification of Works: M&E Works
Project Outline: Factory-Plant

Technical Scope (技術範囲):
As a leading ベトナム設備業者 (Vietnam M&E Contractor), we provide comprehensive solutions for 電気 (Electrical), 空調・換気 (HVAC), 給排水 (Plumbing), and 消火 (Fire Protection) tailored to Japanese industrial requirements.

Constructing integrated technical infrastructure within an active, live manufacturing facility’s new extension demands flexible structural planning, high-scalability load diagnostics, and synchronized dual-source utility frameworks. Kurihara Vietnam, operating as the premier factory M&E contractor, successfully delivered the full-scale mechanical and electrical infrastructure for the high-tech Suncall Technology Vietnam Phase 2 Extension project in Hanoi. Our technical teams prioritized a “Zero-Disruption” execution model, delivering complex high-voltage power hook-ups, heavy fluid piping link-ups, and structural life-safety tie-ins perfectly without causing unexpected downtime to the plant’s active multi-shift electronic component assembly lines.