Wooree Vina Factory

INFORMATION

Client: Wooree Vina Co., Ltd
Location: Vung Tau
Year completed: September 2002
Category: Factory-Plant

description

Project: Wooree Vina Factory
Location: Vung Tau
Owner: Wooree Vina Co., Ltd
Construction Terms: Nov-2001 to Sep-2002
Consultant: N/A
Main Contractor: N/A
Classification of Works: Mechanical Works (ACMV System)
Project Outline: Factory-Plant

Engineering and installing high-performance central cooling structures and specialized micro-climate ventilation grids for tech-heavy manufacturing plants leaves absolute zero margin for error. Kurihara Vietnam factory M&E contractor deployed its elite mechanical engineering frameworks to deliver the specialized ACMV System and Mechanical Works packages for the Wooree Vina Vung Tau Factory. Our technical mission focused heavily on constructing cleanroom-grade air filtering loops, continuous positive-pressure ventilation paths, and optimized factory heat extraction systems under rigid Japanese industrial quality controls to protect sensitive electronic assembly lines.