SEEV Factory – Modification Work
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: SEEV Factory – Modification Work Location: Hanoi Owner: Sei Electronic Components (Vietnam), Ltd Construction Terms: Sep-2017 Main Contractor: Zenitaka Corporation Classification of Works: M & E Works Project Outline: Factory-Plant
Paramount Bed Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Paramount Bed Vietnam Factory Location: Dong Nai Owner: Paramount Bed Vietnam Co., Ltd Construction Terms: May-2014 Main Contractor: Nishimatsu Contruction Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant
VGI-1F Cold End Conversion
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: VGI-1F Cold End Conversion Location: Ba Ria – Vung Tau Owner: NSG Vietnam Glass Industries Ltd Construction Terms: Sep-2018 Main Contractor: NSG Vietnam Glass Industries Ltd Classification of Works: M & E Works Project Outline: Factory-Plant
T2 – Noi Bai Extension
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: T2 – Noi Bai Extension Location: Hanoi Owner: Vietnam Airlines Construction Terms: Dec-2014 Main Contractor: Arinc Incorporated Classification of Works: M & E Works Project Outline: Factory-Plant
NTPM Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: NTPM Vietnam Factory Location: Binh Duong Owner: NTPM Vietnam Co., Ltd Construction Terms: May-2014 Main Contractor: Tan Viet Tin Construction Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant
Air Water Vietnam Insrumentation
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Air Water Vietnam Insrumentation Location: Vung Tau Owner: Sanpo Electrical & Mechanical Engineering Corporation Construction Terms: Feb-2014 Main Contractor: Seamec Vietnam Co., Ltd Classification of Works: M & E Works Project Outline: Factory-Plant
DIC Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: DIC Vietnam Factory Location: Binh Duong Owner: DIC Vietnam Co., Ltd Construction Terms: Nov-2005 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Saigon Centre 2&3 (Special Lighting)
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Saigon Centre 2&3 (Special Lighting) Location: Ho Chi Minh Owner: Kepple Land Wattco II & III Construction Terms: Sep-2017 Main Contractor: Hoa Binh Construction Group JSC Classification of Works: Special lighting Works Project Outline: Office
Savico Plaza Hanoi-Block B
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Savico Plaza Hanoi-Block B Location: Hanoi Owner: Savico Hanoi JSC Construction Terms: Aug-2010 Main Contractor: N/A Classification of Works: M&E works Project Outline: Hotel & Resort
Park Hyatt Saigon Luxury Hotel Redefinition
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Park Hyatt Saigon Luxury Hotel Redefinition Location: Ho Chi Minh Owner: Grand Imperial Saigon Hotel (GISH) Construction Terms: Oct-2015 Main Contractor: Direct contract with Developer (GISH). Builder was VICON, ID Contractor was AA. Classification of Works: M&E works Project Outline: Hotel & Resort
Intercontinental Resort & Spa Danang
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Intercontinental Resort & Spa Danang Location: Da Nang Owner: Sun Group / Terra Joint Stocks Company Construction Terms: Sep-2013 Main Contractor: N/A Classification of Works: M&E works Project Outline: Hotel & Resort
The Sheraton Sai Gon Hotel & Grand Tower 3
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: The Sheraton Sai Gon Hotel & Grand Tower 3 Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: Oct-2005 Main Contractor: Dung Tien Construction Co., Ltd Classification of Works: M&E works Project Outline: Hotel & Resort
Celadon City Ruby (Block C)
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Celadon City Ruby (Block C) Location: Ho Chi Minh Owner: Sai Gon Thuong Tin Tan Thang Investment Real Estate JSC Construction Terms: Sep-2017 Main Contractor: Dung Tien Construction Co., Ltd Classification of Works: Electrical works
Crowne Plaza Nha Trang (Residence)
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Crowne Plaza Nha Trang (Residence) Location: Nha Trang Owner: TD Corporation Construction Terms: May-2014 Main Contractor: Cofico Classification of Works: Electrical works Project Outline: Apartment
The Estella
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: The Estella Location: Ho Chi Minh Owner: Keppel Land & Tien Phuoc Co., Ltd Construction Terms: Dec-2012 Main Contractor: Investco Corporation Classification of Works: Electrical works Project Outline: Apartment
Riviera Point (Block 3,4,5)
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Riviera Point (Block 3,4,5) Location: Ho Chi Minh Owner: Riviera Point Liability Company Limited (RP) Construction Terms: June-2014 Main Contractor: Ssangyong Engineering & Construction Co., Ltd Classification of Works: P&S and ACMV Works Project Outline: Apartment
Caputra Hanoi – Plot D1&D4
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Caputra Hanoi – Plot D1&D4 Location: Hanoi Owner: COFICO Construction Terms: June-2006 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Apartment
Takagi Vietnam Phase II Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Takagi Vietnam Phase II Factory Location: Hung Yen Owner: Fujita Corporation Construction Terms: Jul-2012 Main Contractor: Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Sews-Component Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Sews-Component Vietnam Factory Location: Hanoi Owner: SEWS-Components Vietnam Co., Ltd Construction Terms: June-2011 Main Contractor: Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Pegasus Vietnam Phase II Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Pegasus Vietnam Phase II Factory Location: Hai Duong Owner: Pegasus Vietnam Co., Ltd Construction Terms: June-2011 Main Contractor: Fujita Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Vinax 5 Sanitary Ware Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Vinax 5 Sanitary Ware Factory Location: Hai Duong Owner: Inax Vietnam Sanitary Ware Co., Ltd Construction Terms: May-2010 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Bunka Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Bunka Vietnam Factory Location: Hai Duong Owner: Bunka Vietnam Co., Ltd Construction Terms: Dec-2010 Main Contractor: Fujita Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Coca Cola Beverage Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Location: Ho Chi Minh Owner: Coca Cola Beverage Vietnam Limited Construction Terms: Mar-2010 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Nhieu Loc Thi Nghe Pump Station
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Nhieu Loc Thi Nghe Pump Station Location: Ho Chi Minh Owner: Hynndai Mobis Construction Terms: Sep-2009 Main Contractor: N/A Classification of Works: Mechanical Works Project Outline: Factory-Plant
Intel Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Intel Factory Location: Ho Chi Minh Owner: Intel Corporation Construction Terms: Sep-2009 Main Contractor: Taisei Corporation Classification of Works: Mechanical/BMS Works Project Outline: Factory-Plant
3A Pharmaceutical Warehouse Da Nang
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: 3A Pharmaceutical Warehouse Da Nang Location: Da Nang Owner: 3A Pharmaceutical Co., Ltd Construction Terms: Feb-2008 Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Fujikin Thang Long Production Works
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Fujikin Thang Long Production Works Location: Hanoi Owner: Fujikin Vietnam Co., Ltd Construction Terms: Feb-2020 to Sep-2020 Main Contractor: Fujikin Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Inoac New Production Area Works
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Inoac New Production Area Works Location: Hanoi Owner: Inoac Vietnam Co. Ltd Construction Terms: Feb-2020 to July-2020 Main Contractor: Nakano Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Suzuran Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Suzuran Vietnam Factory Location: Hung Yen Owner: Suzuran Vietnam Co., Ltd Construction Terms: Aug-2018 Main Contractor: Tokura Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Kuroda Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kuroda Factory Location: Hai Duong Owner: Kuroda Kagaku (Viet Nam) Co., Ltd Construction Terms: Aug-2019 to May-2020 Main Contractor: Vinata International Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Rhythm Precision Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Rhythm Precision Vietnam Factory Location: Hanoi Owner: Rhythm Precision Vietnam Co., Ltd Construction Terms: Mar-2015 Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Inoac Production Machine Works
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Inoac Production Machine Works Location: Hanoi Owner: Inoac Vietnam Co. Ltd Construction Terms: April-2019 to Dec-2019 Main Contractor: Inoac Vietnam Co. Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Enkei Factory – Renovation Works
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Enkei Factory – Renovation Works Location: Hanoi Owner: Enkei Vietnam Co., Ltd Construction Terms: April-2019 to Feb-2020 Main Contractor: Zenitaka Corporation/Enkei Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Pentstudio Tay Ho
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Pentstudio Tay Ho Location: Hanoi Owner: CTX Holdings Construction Terms: May-2018 to Dec-2020 Main Contractor: Vietnam Investment Construction and Trading Joint Stock Corporation (CTX Holdings) Classification of Works: M&E Works Project Outline: Apartment
Unilever Homebase
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Unilever Homebase Location: Ho Chi Minh Owner: Unilever Vietnam International Company Limited Construction Terms: June-2019 to Sep-2020 Main Contractor: N/A Classification of Works: M&E works Project Outline: Apartment
Park Hyatt SG
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Park Hyatt SG Location: Ho Chi Minh Owner: Grand Imperial Saigon Hotel Limited Liability Company Construction Terms: May-2019 to Jan-2020 Main Contractor: N/A Classification of Works: M&E works Project Outline: Hotel & Resort
Estella Heights Phase 2
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Estella Heights Phase 2 Location: Ho Chi Minh Owner: Estella Joint Venture Co., Ltd Construction Terms: Oct-2016 to Mar-2019 Main Contractor: Cofico Classification of Works: MEP works Project Outline: Apartment
Yasufuku Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Yasufuku Vietnam Factory Location: Hanoi Owner: Yasufuku Vietnam Co., Ltd Construction Terms: Dec-2003 to Sep-2004 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Yamaha Motor Vietnam 2nd Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Yamaha Motor Vietnam 2nd Factory Location: Hanoi Owner: Yamaha Motor Vietnam Co., Ltd Construction Terms: May-2007 to April-2009 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Yamaha Motor Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Yamaha Motor Vietnam Factory Location: Hanoi Owner: Yamaha Motor Vietnam Co., Ltd Construction Terms: Aug-2004 to Nov-2004 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Yabashi Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Yabashi Vietnam Location: Hanoi Owner: Yabashi Vietnam CAD Technology Corporation Construction Terms: Nov-2004 to Apr-2005 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Wooree Vina Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Wooree Vina Factory Location: Vung Tau Owner: Wooree Vina Co., Ltd Construction Terms: Nov-2001 to Sep-2002 Consultant: N/A Main Contractor: N/A Classification of Works: Mechanical Works (ACMV System) Project Outline: Factory-Plant
Vietnam Steel Products
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Vietnam Steel Products Location: Vung Tau Owner: Vietnam Steel Products Co., Ltd Construction Terms: Jan-2001 to June-2001 Consultant: Sumitomo Metal Indutries Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Vietnam Glass Industries
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Vietnam Glass Industries Location: Vung Tau Owner: Vietnam Float Glass Co., Ltd Construction Terms: Mar-2007 to Aug-2007 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Float Glass Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Float Glass Vietnam Location: Bac Ninh Owner: Vietnam Float Glass Co., Ltd Construction Terms: Jan-1998 to September-1998 Consultant: N/A Main Contractor: Vietnam Float Glass Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Vietnam Coating
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Vietnam Coating Location: Vung Tau Owner: Bluescope Steel Vietnam Co., Ltd Construction Terms: Jun-2004 to Jul-2006 Consultant: Scotte Lincoln Main Contractor: Leigton Contractors Asia Vietnam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Vietnam Brewery Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Vietnam Brewery Factory Location: Ho Chi Minh Owner: Vietnam Brewery Co., Ltd Construction Terms: May-2005 to November-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
United Garment Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: United Garment Factory Location: Binh Duong Owner: United Garment Vietnam Co., Ltd Construction Terms: Sep-2002 to Feb-2003 Consultant: Jurutera Sinarunding Aidil Main Contractor: Architect & Construction Service Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
UMC Electronic Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: UMC Electronic Vietnam Factory Location: Hai Duong Owner: UMC Electronic Vietnam Construction Terms: Jul-2007 to Jul-2008 Consultant: N/A Main Contractor: Hazama Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Toyo Ink Production
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Toyo Ink Production Location: Bac Ninh Owner: Toyo Ink Compound VN Co., Ltd Construction Terms: Jun-2007 to Jun-2008 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Toyoda Giken Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Toyoda Giken Vietnam Location: Hanoi Owner: Toyoda Giken Vietnam Co., Ltd Construction Terms: Dec-2005 to Jul-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Toto Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Toto Vietnam Factory Location: Hanoi Owner: TOTO Vietnam Co., Ltd Construction Terms: Dec-2002 to July-2004 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Thu Duc Boo Water treatment plant
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Thu Duc Boo Water treatment plant Location: Ho Chi Minh Owner: Thu Duc Boo Water Treatment Plant Co., Ltd Construction Terms: Jan-2007 to Mar-2009 Consultant: N/A Main Contractor: Huyndai Mobis Classification of Works: M&E Works Project Outline: Factory-Plant
Thang Long Logistics Center
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Thang Long Logistics Center Location: Hanoi Owner: Thang Long Logistics Co., Ltd Construction Terms: Mar-2002 to Aug-2002 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Goshi ThangLong Auto Parts Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Goshi ThangLong Auto Parts Factory Location: Hanoi Owner: Goshi Thang Long Auto Parts Co., Ltd Construction Terms: Mar-2006 to Sep-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Swire Cold Storage Project
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Swire Cold Storage Project Location: Binh Duong Owner: Swire Cold Pacific Co., Ltd Construction Terms: May-2005 to Dec-2005 Consultant: N/A Main Contractor: Beca Classification of Works: M&E Works Project Outline: Factory-Plant
Suncall Technology Vietnam Factory – Phase 2
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Suncall Technology Vietnam Factory – Phase 2 Location: Hanoi Owner: Suncall Technology Vietnam Co., Ltd Construction Terms: Jan-2005 to Jul-2005 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Sumitomo Heavy Industries
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Sumitomo Heavy Industries Location: Hanoi Owner: Sumitomo Heavy Industries Vietnam Co., Ltd Construction Terms: Sep-2006 to Jun-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Sumirubber Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Sumirubber Vietnam Location: Hai Phong Owner: Sumirubber Hybrid Vietnam Vietnam Co., Ltd Construction Terms: Mar-2006 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Stanley Electric Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Stanley Electric Vietnam Factory Location: Hanoi Owner: Stanley Electric Vietnam Co., Ltd Construction Terms: Jan-2005 to Sep-2005 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
San Miguel Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: San Miguel Vietnam Factory Location: Dong Nai Owner: San Miguel Vietnam Factory Construction Terms: Jul-2005 to Aug-2006 Consultant: N/A Main Contractor: Architect Construction Service Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Ryonan Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Ryonan Vietnam Factory Location: Hanoi Owner: Ryonan Electric Vietnam Co., Ltd Construction Terms: Oct-2003 to Sep-2004 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Nagatsu Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Nagatsu Vietnam Location: Hanoi Owner: Nagatsu Vietnam Co., Ltd Construction Terms: Nov-2007 to June-2008 Consultant: T&E Consultant Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Mekong Flour Mills
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Mekong Flour Mills Location: Vung Tau Owner: Mekong Flour Mills Vietnam Co., Ltd Construction Terms: July-2002 to Feb-2003 Consultant: T&E Consultant Main Contractor: T/A Classification of Works: M&E Works Project Outline: Factory-Plant
Meisei Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Meisei Vietnam Location: Vinh Phuc Owner: Meisei Vietnam Co., Ltd Construction Terms: Mar-2006 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Marumitsu Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Marumitsu Vietnam Location: Vinh Phuc Owner: Marumitsu Vietnam Co., Ltd Construction Terms: Mar-2004 to Sep-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Kuroda Kagaku Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kuroda Kagaku Vietnam Location: Hai Duong Owner: Kuroda Kagaku Vietnam Co., Ltd Construction Terms: Oct-2006 to July-2007 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Kishiro Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kishiro Vietnam Factory Location: Hanoi Owner: Kishiro Vietnam Co., Ltd Construction Terms: Oct-2006 to May-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Kian Joo Can Vietnam Co., Ltd
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kian Joo Can (Vietnam) Factory Location: Binh Duong Owner: Kian Joo Can Vietnam Co., Ltd Construction Terms: Sep-2002 to Nov-2003 Consultant: N/A Main Contractor: Kian Joo Can Classification of Works: M&E Works Project Outline: Factory-Plant
Kayaba Vietnam Co., Ltd
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kayaba Vietnam Location: Hanoi Owner: Kayaba Vietnam Co., Ltd Construction Terms: Dec-2002 to Mar-2003 Consultant: N/A Main Contractor: Taisei Corporation Classification of Works: Mechanical Works Project Outline: Factory-Plant
Kao Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Kao Vietnam Factory Location: Dong Nai Owner: Kao Vietnam Co., Ltd Construction Terms: June-1996 to Feb-1997 Consultant: N/A Main Contractor: N/A Classification of Works: Mechanical Works Project Outline: Factory-Plant
Jotun Paints Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Jotun Paints Vietnam Location: Binh Duong Owner: Jotun Paints Vietnam Co., Ltd Construction Terms: May-2004 to Feb-2006 Consultant: Haskoning Vietnam Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Jebsen & Jessen Broadway Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Jebsen & Jessen Broadway Vietnam Location: Bac Ninh Owner: Jebsen & Jessen Broadway Vietnam Co., Ltd Construction Terms: Mar-2006 to Oct-2006 Consultant: Viet Architect Main Contractor: Him Lam Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Iritani Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Iritani Vietnam Location: Hanoi Owner: Iritani Vietnam Co., Ltd Construction Terms: Dec-2005 to Sep-2006 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
InterFlour Mills Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: InterFlour Mills Vietnam Location: Vung Tau Owner: Vietnam Flour Mills Co., Ltd Construction Terms: Jan-2002 to Oct-2003 Consultant: COFICO Main Contractor: Raymond Woo & Assc Classification of Works: M&E Works Project Outline: Factory-Plant
Ikeuchi Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Ikeuchi Vietnam Location: Hanoi Owner: Ikeuchi Vietnam Co., Ltd Construction Terms: July-2007 to Aug-2007 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Honest Vietnam
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Honest Vietnam Location: Vinh Phuc Owner: Honest Vietnam Co., Ltd Construction Terms: Aug-2006 to Jun-2007 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Hansae Garment Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Hansae Garment Factory Location: Ho Chi Minh Owner: Hansae (Vietnam) Co., Ltd Construction Terms: Nov-2001 to Dec-2002 Consultant: Cideco Co., Ltd Main Contractor: A&B Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Hanoi Metal One Steel Center Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Hanoi Metal One Steel Center Factory Location: Hai Duong Owner: Hanoi Metal One Steel Center Co., Ltd Construction Terms: Dec-2006 to Jun-2007 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Fujikin Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Fujikin Vietnam Factory Location: Hanoi Owner: Sumitomo Mitsui Construction Co., Ltd Construction Terms: July-2005 to Sep-2006 Consultant: Sumitomo Mitsui Construction Co., Ltd Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
F&N Vietnam Foods
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: F&N Vietnam Foods Location: Binh Duong Owner: F&N Vietnam Foods Co., Ltd Construction Terms: Nov-2002 to Sep-2003 Consultant: F&N Vietnam Co., Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Enkei Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Enkei Vietnam Factory Location: Hanoi Owner: The Zenitaka Corporation Construction Terms: Feb-2008 to July-2009 Consultant: N/A Main Contractor: The Zenitaka Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Endo Stainless Steel Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Endo Stainless Steel Vietnam Factory Location: Hanoi Owner: Sumitomo Mitsui Construction Co., Ltd Construction Terms: Nov-2007 to May-2008 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
DIC Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: DIC Vietnam Factory Location: Binh Duong Owner: Shimizu Corporation Construction Terms: July-2005 to Nov-2005 Consultant: N/A Main Contractor: Shimizu Corporation Classification of Works: M&E Works Project Outline: Factory-Plant
Box Pak Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Box Pak Vietnam Factory Location: Binh Duong Owner: Box Pak Vietnam Co., Ltd Construction Terms: Nov-2003 to Nov-2004 Consultant: N/A Main Contractor: Trung Dung Construction Classification of Works: M&E Works Project Outline: Factory-Plant
Bemac Panels Manufacturing Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Bemac Panels Manufacturing Vietnam Factory Location: Hanoi Owner: Vinata International J.V Co., Ltd Construction Terms: July-2004 to July-2005 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
Beautec Garment Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Beautec Garment Factory Location: Binh Duong Owner: Beautec Garment Factory Construction Terms: Sep-2002 to October-2003 Consultant: CIDECO Main Contractor: A&B Interior Classification of Works: M&E Works Project Outline: Factory-Plant
Amway Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Amway Vietnam Factory Location: Dong Nai Owner: Amway Vietnam Factory Construction Terms: Jan-2007 to August-2007 Consultant: Delta Construction Management Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Amanda Foods Vietnam Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Amanda Foods Vietnam Factory Location: Dong Nai Owner: Amanda Foods Vietnam Factory Construction Terms: Mar-2003 to May-2004 Consultant: Amigos Main Contractor: Amigos, Indochine engineering Classification of Works: M&E Works Project Outline: Factory-Plant
Alpha Industries Factory
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: Alpha Industries Factory Location: Hanoi Owner: Vinata International J.V Co., Ltd Construction Terms: July-2005 to Sep-2006 Consultant: N/A Main Contractor: Vinata International J.V Co., Ltd Classification of Works: M&E Works Project Outline: Factory-Plant
3A Pharmaceutical WareHouse
- Client: Factory-Plant
- Year completed: 2020
- Project leader: kurihara
Project: 3A Pharmaceutical WareHouse Location: Ho Chi Minh Owner: 3A Pharmaceutical Co., Ltd Construction Terms: July-2006 to Mar-2007 Consultant: J Roger Preston Vietnam Co., Ltd Main Contractor: N/A Classification of Works: M&E Works Project Outline: Factory-Plant
Hyatt Regency Danang Resort and Spa Hotel
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Hyatt Regency Danang Resort and Spa Hotel Location: Da Nang Owner: Marble Mountain Beach Resort JS Company Construction Terms: Nov-2004/2005 to Dec-2006 Consultant: Indochine Engineering Vietnam Ltd Main Contractor: Contec Construction Joint Stock Company Classification of Works: M&E Works Project Outline: Hotel & Resort
Sheraton AA,Maintenance
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Sheraton AA,Maintenance Location: Ho Chi Minh Owner: Ocean Place JV Co., Ltd Construction Terms: Nov-2004/2005 to Dec-2006 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Hotel
Vung Tau P&T Hotel
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Vung Tau P&T Hotel Location: Vung Tau Owner: Vietnam Telecom Company Construction Terms: Feb-1999 to Sep-2000 Consultant: Vietnam Thermos Main Contractor: TRACODI., Ltd Classification of Works: M&E Works Project Outline: Hotel
The Sheraton Sai Gon Hotel & Grand Tower
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: The Sheraton Sai Gon Hotel & Grand Tower Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: Nov-2004 to Oct-2005 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: Hotel
Sofitel Plaza Hanoi (Westiake International Hotel)
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Sofitel Plaza Hanoi (Westiake International Hotel) Location: Hanoi Owner: Sofitel Plaza Hanoi Co., Ltd Construction Terms: Jan-2003 to June-2003 Consultant: N/A Main Contractor: AA Corporation Classification of Works: M&E Works Project Outline: Hotel
Novotel Garden Plaza
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Novotel Garden Plaza Location: Ho Chi Minh Owner: Ssangyong Engineering & Construction Co., Ltd Construction Terms: May-2004 to April-2005 Consultant: Meinhartd Main Contractor: AA Corporation Classification of Works: M&E Works Project Outline: Hotel
Hanoi Hotel Extension
- Client: Hotel & Resort
- Year completed: 2020
- Project leader: kurihara
Project: Hanoi Hotel Extension Location: Hanoi Owner: Hanoi Hotel Construction Terms: Nov-1995 to March-1997 Consultant: V.Best Consultant Co., Ltd Main Contractor: Hanoi Hotel Classification of Works: Coordination Works,Electrical Works, Fire Protection System Project Outline: Hotel
Metro C&C HyperMarket
- Client: HyperMarket
- Year completed: 2020
- Project leader: kurihara
Project: Metro C&C HyperMarket Location: Hanoi Owner: Metro C&C Hypermarket VN Ltd Construction Terms: April-2003 to July-2003 Consultant: AGG Co. Main Contractor: Axima Klampfer Standley Co., Ltd. Classification of Works: M&E Works Project Outline: Hypermarket
Metro C&C HyperMarket District 6
- Client: HyperMarket
- Year completed: 2020
- Project leader: kurihara
Project: Metro C&C HyperMarket District 6 Location: Ho Chi Minh Owner: Metro C&C Hypermarket VN Ltd Construction Terms: Dec-2001 to April-2002 Consultant: AGG Co. Main Contractor: Klampler & Axima Standley Co., Ltd Classification of Works: M&E Works Project Outline: Hypermarket
Metro C&C HyperMarket District 2
- Client: HyperMarket
- Year completed: 2020
- Project leader: kurihara
Project: Metro C&C HyperMarket District 2 Location: Ho Chi Minh Owner: Metro C&C Hypermarket VN Ltd Construction Terms: Aug-2002 to Feb-2003 Consultant: AGG Co. Main Contractor: Klampler & Axima Classification of Works: M&E Works Project Outline: Hypermarket
Cho Ray Hospital
- Client: Hospital
- Year completed: 2020
- Project leader: kurihara
Project: Cho Ray Hospital Location: Ho Chi Minh Owner: Cho Ray Hospital Construction Terms: Dec-2001 to Mar-2002 Consultant: AXS Main Contractor: JICA Classification of Works: Mechanical Works (P&S System) Project Outline: Hospital
Hanoi French Hospital
- Client: Hospital
- Year completed: 2020
- Project leader: kurihara
Project: Hanoi French Hospital Location: Hanoi Owner: French Hospital Construction Terms: April-2002 to Nov-2003 Consultant: Sacidelta Construction J.V, Ltd Main Contractor: APAVE J.V Co., Ltd Classification of Works: M&E Works Project Outline: Hospital
United Nations International School
- Client: School
- Year completed: 2020
- Project leader: kurihara
Project: United Nations International School Location: Hanoi Owner: UNIS Construction Terms: Feb-2007 to Feb-2008 Consultant: N/A Main Contractor: N/A Classification of Works: M&E Works Project Outline: School
Can Tho University Resource Center
- Client: School
- Year completed: 2020
- Project leader: kurihara
Project: Can Tho University Resource Center Location: Can Tho Owner: RMIT Vietnam Holding PTY Co., Ltd Construction Terms: Dec-2004 to April-2006 Consultant: Indochine Engineering Main Contractor: Hoa Binh Corporation Classification of Works: M&E Works Project Outline: School
ACG International School Vietnam
- Client: School
- Year completed: 2020
- Project leader: kurihara
Project: ACG International School Vietnam Location: Ho Chi Minh Owner: Academic Collegue Groups Construction Terms: Apr-2007 to Nov-2007 Consultant: N/A Main Contractor: Tan Ky Co., Ltd Classification of Works: M&E Works Project Outline: School
Vietcombank Tower
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Vietcombank Tower Location: Ha Noi Owner: Fels Construction Techniques Ltd Construction Terms: Jan-1999 to March-2001 Consultant: MEI Project Engineers PTE., Ltd Main Contractor: FELS Construction Techniques Limited Classification of Works: Heating, Ventilation & Air-conditioning Services Electrical Works, Fire Protection System Project Outline: Office Building
Thang long Industrial Park Center
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Thang long Industrial Park Center Location: Ha Noi Owner: Thang Long Industrial Park Co., Ltd Construction Terms: Oct-2001 to Aug-2002 Consultant: N/A Main Contractor: Sumitomo Mitsui Construction Co., Ltd. Classification of Works: M&E NetWorks Project Outline: Office Building
Hanoi Southern SwitchBoard
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Hanoi Southern SwitchBoard Location: Ha Noi Owner: Hanoi Post and Telecommunication Construction Terms: July-2001 to Mar-2002 Consultant: VNCC Company Main Contractor: N/A Classification of Works: Air-con System Telephone and Computer NetWorks Project Outline: Office Building
IVB Indovina Bank
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: IVB Indovina Bank Location: Ha Noi Owner: IVB Indovina Bank Construction Terms: Dec-2005 to Jan-2007 Consultant: N/A Main Contractor: N/A Classification of Works: M & E Works Project Outline: Office Building
Centre Point Office Building
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Centre Point Office Building Location: Ho Chi Minh Owner: Nguyen Vu Investment & Construction JSC Construction Terms: Jan-2008 to August-2009 Consultant: HBP/ICE Main Contractor: Coteccons Classification of Works: M & E Works Project Outline: 15 Storey Office Building, 44,853 sqm
Bitexco Financial Tower
- Client: Office
- Year completed: 2020
- Project leader: kurihara
Project: Bitexco Financial Tower Location: Ho Chi Minh Owner: Binh Minh Import Export Production & Trade Co., Ltd Construction Terms: July-2010 to June-2011 Consultant: Tuner Main Contractor: Hyundai E&C Classification of Works: M & E Works Project Outline: 68 Storey Office Building 42,600 sqm
Ha Tay Brewery
- Client: Entertainment Center
- Year completed: 2020
- Project leader: kurihara
Project: Ha Tay Brewery Location: Ha Noi Owner: Hatay Brewery Co., Ltd Construction Terms: August-2003 to November-2003 Consultant: Chuchawal Main Contractor: N/A Classification of Works: M & E Works Project Outline: Entertainment Center
Spring Court Apartment
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Spring Court Apartment Location: Ho Chi Minh Owner: Trang Anh Vinh Co., Ltd Construction Terms: May-2005 to 2006 Consultant: Indochine Engineering Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment
Sai Gon Hotel & Grand Tower
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Sai Gon Hotel & Grand Tower Location: Ho Chi Minh Owner: Ocean Place J.V Co., Ltd Construction Terms: November-2005 to December-2006 Consultant: JRP Co., Ltd Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment
Sky Garden
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Sky Garden Location: Ho Chi Minh Owner: Fujita Corporation Construction Terms: June-1996 to Jan-1998 Consultant: Acer Consultants Ltd Main Contractor: N/A Classification of Works: M & E Works Project Outline: Apartment
Rivera Villas
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Rivera Villas Location: Ho Chi Minh Owner: Sai Gon Rivera JV Co., Ltd Construction Terms: Oct-2008 to Dec-2009 Consultant: Hainal Konyi Main Contractor: Investco Classification of Works: M & E Works Project Outline: Apartment
Phu My Hung Apartment
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Phu My Hung Apartment Location: Ho Chi Minh Owner: Phu My Hung Corporation Construction Terms: Sep-2002 to Sep-2004 Consultant: Sino Pacific Main Contractor: Cofico Classification of Works: M & E Works Project Outline: Apartment
Hung Vuong Plaza
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Hung Vuong Plaza Location: Ho Chi Minh Owner: M & C Corporation and Others Construction Terms: Apr-2004 to May-2004 Consultant: AIC Consultant Main Contractor: M & C Corporation Co No.1 Classification of Works: M & E Works, design works Project Outline: Commercial Building and Apartment.
Hanoi Tower Center
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Hanoi Tower Center Location: Ha Noi Owner: Hanoi Tower Center Co., Ltd. Construction Terms: Jun-1995 to Nov-1997 Consultant: Alpha Engineering Main Contractor: Ssangyong E&C Co.,Ltd. Classification of Works: Electrical Works Plumbing & Sanitary Works Project Outline: Apartment, Office Bldg 45,000 m2
Ciputra Hanoi
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Ciputra Plot D1 & D4 Location: Ha Noi Owner: Citra West Lake Development Construction Terms: Aug-2003 to Jun-2006 Consultant: N/A Main Contractor: Cofico Classification of Works: M&E Works Project Outline: Resident House
Cantavil Apartment
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Cantavil Highrise Building Location: Ho Chi Minh Owner: Daewon Co., Ltd Construction Terms: May-2005 to Jun-2007 Consultant: CD Co. Classification of Works: M&E Works Project Outline: 118 Storey Apartment Bldg. Three Towers, 405 Units
Avalon Department
- Client: Apartment
- Year completed: 2020
- Project leader: kurihara
Project: Avalon Apartment Location: Ho Chi Minh Owner: Avalon Saigon Co., Ltd Construction Terms: May-2005 to Oct-2006 Consultant: Indochine Engineering Classification of Works: M&E Works Project Outline: 12 Storey Apartment Bldg.64 Units