Commonly Asked Questions

Commonly Asked Questions

  • Type of Company?

    100% Foreign Owner.

  • Principal Business Activity?

    • Construction of Electrical system (high, low voltage and extra-low voltage) and Mechanical system (HVAC, Plumbing, Fire Protection) for residential, commercial and industrial projects.
    • Design and consulting engineering service for M&E system.

  • Type of Works/Trades/ Services Undertaking by the Firm?

    • MEP – Mechenical (ACMV)
    • MEP – Electrical (EL)
    • MEP – Extra_Low Voltage (ELV)
    • MEP – Plumbing & Sanitary (P&D)
    • MEP – Fire Protection (FP)
    • Swimming pool and Water feature works
    • Generator work
    • Others (Please specify: Special and façade lighting works)

  • No of years of experience in the carrying out the MEP works?

    25 years

  • Financial Institution information ?

    • MUFG Bank Ltd – Hanoi Branch
      Address: 6th & 7th Floor, Pacific Building, 83B Ly Thuong Kiet Street, Ha Noi
    • Sumitomo Mitsui Banking Corporation – Hanoi Branch
      Address: Unit 1201, 12th Floor, Lotte Center Hanoi, 54 Lieu Giai, Cong Vi Ward, Ba Dinh District, Hanoi

  • Litigation?

    Is your firm currently involved (or has been involved in the last five (5) years) in any arbitration/litigation or pending arbitration/ litigation relating to claims or disputes of any sort on any contract?

    • No.

  • The tenderer comply the tax regulation as stated in the Law of Vietnam?

    Yes.

  • Quality assurance and sustainable certification by internationally recognized bodies e.g ISO, GreenMark, LEDDs

    • Certificate of BCA Green Mark Award for The Estella Phase 1 certified by BCA International Pte Ltd.
    • Certificate of BCA Green Mark Award (Gold, Full Certification) for The Estella Phase 1 certified by Building & Construction Authority.
    • Certificate of Provision BCA Green Mark Award for Riviera Point High-Rise Residential Development certified by Building & Construction Authority.

  • Plant and Equipment list OWNED ?

    a) Machinery

    • Air compressor
      90 liter/8 bar used in project
    • Grinding machine
      850W, 8pcs/project
    • Electric Hammer drill
      790W, 2pcs/project
    • Driling machine
      650W, 9 pcs/project
    • Hacking Drill Machine
      550W, 5 pcs/project
    • Vacuum cleaner
      2600W, 2 pcs/project

    b) Instrument

    • Phase sequence meter
      2pcs/project
    • Pressure tester
      2pcs/project
    • Pressure gauge
      5pcs/project
    • Earth tester
      2pcs/project
    • Insulation tester (Mega test)
      2pcs/project
    • Sound level meter
      2pcs/project
    • DS meter (conductivity meter)- CBI
      2pcs/project
    • Temperature gauge (dry-wet bulb)-Magnehelic
      1pcs/project
    • Thermometer
      2pcs/project
    • Electrical Marker Machine LETAWIN390
      4pcs/project
    • Clamp meter
      2pcs/project
    • Water Flowmeter
      2pcs/project