- Hanoi (+84-024) 3556 6394 | [email protected]
- HCM (+84-028) 3999 0841 | [email protected]
| Client: | Suncall Technology Vietnam Co., Ltd |
|---|---|
| Location: | Ha Noi |
| Year completed: | July 2005 |
| Category: | Factory-Plant |
Project: Suncall Technology Vietnam Factory – Phase 2
Location: Hanoi
Owner: Suncall Technology Vietnam Co., Ltd
Construction Terms: Jan-2005 to Jul-2005
Consultant: N/A
Main Contractor: The Zenitaka Corporation
Classification of Works: M&E Works
Project Outline: Factory-Plant
Constructing integrated technical infrastructure within an active, live manufacturing facility’s new extension demands flexible structural planning, high-scalability load diagnostics, and synchronized dual-source utility frameworks. Kurihara Vietnam, operating as the premier factory M&E contractor, successfully delivered the full-scale mechanical and electrical infrastructure for the high-tech Suncall Technology Vietnam Phase 2 Extension project in Hanoi. Our technical teams prioritized a “Zero-Disruption” execution model, delivering complex high-voltage power hook-ups, heavy fluid piping link-ups, and structural life-safety tie-ins perfectly without causing unexpected downtime to the plant’s active multi-shift electronic component assembly lines.