DIC Vietnam Factory

INFORMATION

Client: Shimizu Corporation
Location: Binh Duong
Year completed: November 2005
Category: Factory-Plant

description

Project: DIC Vietnam Factory
Location: Binh Duong
Owner: Shimizu Corporation
Construction Terms: July-2005 to Nov-2005
Consultant: N/A
Main Contractor: Shimizu Corporation
Classification of Works: M&E Works
Project Outline: Factory-Plant

Constructing integrated technical infrastructure for continuous heavy chemical blending, high-load material milling lines, and volatile fluid logistics demands superior power grid resilience, heavy-duty fluid dynamics, and rigid hazardous-zone process ventilation networks. Kurihara Vietnam, operating as the premier factory M&E contractor, successfully delivered the full-scale mechanical and electrical infrastructure for the high-tech DIC Vietnam Binh Duong Factory. Our project delivery focused on deploying synchronized high-voltage electrical distribution, complex chemical-resistant utility piping loops, and explosion-proof life safety networks engineered under rigid Japanese technical compliance to sustain uninterrupted manufacturing schedules.